Finished figuring out where everything goes. 14 boxes to anchor. I have to switch a couple of switches. It's not the switch you switch, it's the switch you have to switch. The low voltage switch goes here and the high voltage switch goes on the tracker. The concrete is poured and stucco applied, for the control center wall. Monday, Dec. 10 we can drill holes in the new wall for anchors. I have as many as 7 holes to drill for conduit connectors in some junction boxes. I may cut and assemble all conduit here, on the floor, before anchoring the boxes to the wall outside, under the eve.