PROJECT EARTHBILLY

 HOME

SYSTEM DIAGRAM

Online Journal

Solar Hot Water

Tracker 1&2

Array 3

Control Center

Wind Turbine

WIND 2

WIND 3

WIND 4

WIND 5

PV OUTPUT DATA

WOODNEY JOB  NEXT PAGE OF THIS INSTALLATION   BACK TO OTHER INSTALLATIONS HOME PAGE

These photos are taken 5/29/2013 The panels are due in 5/30. We plan to install them on 6/2. Niles has built a fabulous heavy duty rack! It will be ready by 6/1. I installed the SMA SB7000TL inverter on 5/29. BTW I now have NABCEP qualified training.

Will you look at the amazing job Niles did with this heavy duty 3 string 7.5 KW rack!! All racking parts are available through local building supply. Some parts refined/redirected with TLC by Niles.

BACK TO OTHER INSTALLATIONS HOME PAGE  NEXT PAGE OF THIS INSTALLATION

 

Copyright 2007 Earthbilly Organics